PROJECT DEVELOPMENT
Four steps to get a Turbulent plant going.
Turbulent hydropower plants can be installed all over the world in connection with local distributors, who have the knowledge of their region’s water rights and permits to contribute to the project. Working with official local distributors helps end users keep their costs down, but in certain instances we can offer services to augment.
Along with the production of the turbine, Turbulent can optionally assist you for each step. Get in touch with us in order to get a precise quotation for your needs.
Pre-Study
1
1
-
Primary assessment/site evaluation
-
Estimation proposal and purchase agreement for detailed engineering
-
Go or No-Go on financial and technical viability
Technical Design & Preparation
2
2
-
Detail of the implementation planning
-
Technical preparation and production documents
-
Reduce investment costs
Turbine Production & Installation
3
3
-
Construction of the turbine with concrete and high quality materials
-
Installation and external revision of the hydraulic system and the electrical connections to the grid
-
Operational gain guarantee/high performance
-
This stage can be completed within six months
Maintenance
4
4
-
Corrective maintenance and system updates
-
Remote monitoring system 24/7, keeping the performance of the system high
-
Guarantee of energy availability and system efficiency
Minimal maintenance.
We estimate the lifetime of an entire system to be 30 years provided the maintenance plan is followed. Our maintenance plan is simple.
Initial inspection and gearbox oil change
Small maintenance: gearbox oil change + check of fasteners, leakage, noise
Electrical cabinets check
Large maintenance: small maintenance + seal replacement + bearing re-lubrication
Genset Lifetime
150h
1 yr
2 years
3 years
10 to 15 years